Skip to content

EnergyNorthwest.com

Your Source for Energy Jobs & Industry News

Menu
  • Home
  • Energy Jobs
  • Energy Jobs In NW
  • Industry News
  • Resumes

Tag: Fast

India’s Prototype Fast Breeder Nuclear Reactor Moves Closer to Criticality

August 2, 2024
| No Comments
| Industry News

India’s Atomic Energy Regulatory Board (AERB) will allow the country’s flagship 500-MWe/1,250-MWth prototype fast-breeder reactor (PFBR) in Kalpakkam, Tamil Nadu, to approach criticality. The nuclear energy safety watchdog on July 30 […]

The post India’s Prototype Fast Breeder Nuclear Reactor Moves Closer to Criticality appeared first on POWER Magazine.

Fuel loading began in March 2024 at India’s 500-MWe/1,250-MWth prototype fast-breeder reactor (PFBR) located at Kalpakkam, Tamil Nadu. Courtesy: Bharatiya Nabhikiya Vidyut Nigam Ltd.

POWER Magazine…

Read More »

Kemmerer 1 Breaks Ground: A Look at TerraPower’s Natrium Fast Reactor Nuclear Power Plant

June 16, 2024
| No Comments
| Industry News

Bill Gates’ nuclear innovation firm TerraPower has broken ground on the non-nuclear portion of Kemmerer Unit 1, a 345-MW Natrium sodium-cooled fast reactor (SFR) power plant. The groundbreaking on June […]

The post Kemmerer 1 Breaks Ground: A Look at TerraPower’s Natrium Fast Reactor Nuclear Power Plant appeared first on POWER Magazine.

A bird's eye view of TerraPower's Natrium advanced nuclear reactor plant.

POWER Magazine…

Read More »

Rosatom Accepts First MOX Fuel Batch for BN-800 Fast Reactor

July 26, 2020
| No Comments
| Industry News

The post Rosatom Accepts First MOX Fuel Batch for BN-800 Fast Reactor appeared first on POWER Magazine.

Rosatom, the Russian state-owned nuclear energy company, said it is ready to receive a shipment of the first full reload batch of fresh uranium-plutonium mixed-oxide (MOX) fuel for the BN-800 fast reactor at the Beloyarsk Nuclear Power Station, the nation’s oldest operating  nuclear energy facility.

The company on July 23 announced the Mining and Chemical Combine, the Russian facility in Zheleznogorsk, a city in the Krasnoyarsk region in East Siberia, had manufactured the fuel. Rosatom said 169 fuel assemblies have been accepted by Rosenergoatom, which operates Russia’s nuclear power plants, and its authorized representative VPO ZAES. That group confirmed the fuel was ready to be shipped.

The Rosatom announcement came at the same time as U.S. Department of Energy (DOE) Secretary Dan Brouillette said his agency is working to end U.S. reliance on Russia for nuclear fuel. Brouillette, in comments to members of Congress who focus on energy, said the DOE’s Nuclear Fuel Working Group wants American-sourced uranium for domestic nuclear plans.…

Read More »

Report: These jobs are dying fast, lost to automation – The Mercury News

October 12, 2019
| No Comments
| Energy Jobs

Report: These jobs are dying fast, lost to automation  The Mercury News
“job” – Google News…

Read More »

Job Covey Wallace: 5 Fast Facts You Need to Know – Heavy.com

September 22, 2019
| No Comments
| Energy Jobs

Job Covey Wallace: 5 Fast Facts You Need to Know  Heavy.com

Job Covey Wallace is a missing Marine who disappeared in Arizona. Now FBI documents may offer a surprise twist in the vanishing of Job Wallace.

“job” – Google News…

Read More »

DOE Speeds Up Development of Experimental Fast Reactor, Sustain Flagging U.S. Nuclear Sector

August 9, 2019
| No Comments
| Industry News

The Department of Energy (DOE) officially launched development of its Versatile Test Reactor (VTR), a fast reactor that will foster experiments with much higher neutron energy and flux compared to the nation’s existing 35 research reactors to develop advanced nuclear fuel for future nuclear power plants in the U.S. The facility, it says, is necessary to keep the nation technologically competitive with China and Russia.

The agency on Aug. 5 published a Notice of Intent in the Federal Register announcing it would develop an environmental impact statement (EIS) to study impacts of building the novel experimental reactor. The DOE will accept public comment on what the draft EIS should include until Sept. 4, and it plans to issue a draft EIS analysis within “the next several months” for public comment. 

On Monday, the DOE also announced that it is considering two locations for the VTR: Idaho National Laboratory (INL) in eastern Idaho, and Oak Ridge National Laboratory in eastern Tennessee. Two sites, INL and the Savannah River site in South Carolina, are also under consideration for the fabrication of the fuel needed to run the VTR.…

Read More »

Posts pagination

1 2 Next

EnergyNorthwest.com 2025 . Powered by WordPress