Skip to content

EnergyNorthwest.com

Your Source for Energy Jobs & Industry News

Menu
  • Home
  • Energy Jobs
  • Energy Jobs In NW
  • Industry News
  • Resumes

Tag: TPoint

MHPS Grid-Connects T-Point 2 Advanced Gas Turbine Validation Facility

April 6, 2020
| No Comments
| Industry News

The post MHPS Grid-Connects T-Point 2 Advanced Gas Turbine Validation Facility appeared first on POWER Magazine.

Mitsubishi Hitachi Power Systems, Ltd. (MHPS) has begun commissioning T-Point 2, its newest combined cycle power plant validation facility that will eventually host the company’s much-watched autonomous combined cycle power project.

The 566-MW facility at Takasago Works in Hyogo Prefecture, Japan, will replace the iconic  T-Point facility, which MHPS’s parent company Mitsubishi Heavy Industries (MHI) completed in 1997 as a 60-Hz followup to the 1992-built 50-Hz K-Point validation plant in Kanazawa. Like its predecessors, T-Point 2 has been designed as an ultramodern power plant—which will actively supply power to the regional grid—and a demonstrator that will enable engineers to push the realms of gas turbine technology.

Construction of T-Point 2 began in late 2017 following years of engineering efforts, and MHPS announced on April 2 it has now been synced to the grid and is currently operating at full load—ahead of schedule. Commercial operations at T-Point 2 are now expected to begin in July 2020.…

Read More »

EnergyNorthwest.com 2025 . Powered by WordPress