Skip to content

EnergyNorthwest.com

Your Source for Energy Jobs & Industry News

Menu
  • Home
  • Energy Jobs
  • Energy Jobs In NW
  • Industry News
  • Resumes

Tag: Bulk

NERC Issues Grim Outlook for Bulk Power System Winter Reliability

November 21, 2021
| 1 Comment
| Industry News

The North American Electric Reliability Corp. (NERC) is warning that much of the central U.S.—a region that stretches from the Great Lakes into southern Texas—may face critical power deficiencies during extreme winter weather conditions over the next three months. Natural gas supply disruptions and low hydropower conditions could also imperil power reliability in New England and the West, it said. 

In its Nov. 18–issued 2021–2022 Winter Reliability Assessment, the nation’s designated Electric Reliability Organization (ERO) urged generators across the U.S. to take proactive steps to prepare for an eventful winter and keep communications open with grid operators.

NERC also called on grid operators to prepare and implement cold weather operating plans, conduct drills, and poll generators for fuel and availability status. Load-serving entities should review critical loads to prevent disruptions, and regulators should support requested environmental waivers, it said.

A Cold, Hard Outlook

The ERO’s dire report echoes its May-issued summer assessment, when it warned of “elevated risks” for energy emergencies in Texas, New England, in the Midcontinent Independent System Operator (MISO) territory, and parts of the West.…

Read More »

Where Are We After 10 Years of Bulk Electric System Reliability Standards?

January 24, 2017
| No Comments
| Industry News

As concerns about grid security increase globally, it’s a good time to review the history, scope, and effect of North American electric system reliability standards. As the threat landscape changes, standards alone are not enough.

Mandatory. That’s the key word in the Energy Policy Act of 2005 (EPAct) where grid security is concerned. Within two years of that legislative action, the electric power industry was welcomed into the world of operation and planning regulation far beyond anything that had come before. As of June 18, 2017, we will have 10 years of experience with mandatory reliability standards. Are we better off as a result? Are the costs of compliance commensurate with the benefits? Will changes in approach to compliance currently under way enable a more efficient regulatory environment going forward? This article examines how we got to the current system and where we may go from here.

The Triggering Event

The April 14, 2003, blackout of much of the northeastern United States and parts of Canada was the impetus for EPAct and the accompanying changes to Section 215 of the Federal Power Act.…

Read More »

Risk-Based NERC Compliance: Assessing Risk to Bulk Power System Generation

June 2, 2016
| No Comments
| Industry News

Ensuring the reliability of the power system is the responsibility of many industry participants. In this POWER exclusive, one regional reliability entity, the Midwest Reliability Organization, explains its role.

In response to the 2003 Blackout—which affected parts of the U.S. Northeast and Midwest, plus portions of the Canadian province of Ontario—the U.S. Congress mandated adoption of reliability standards for the bulk power system (BPS). The North American Electric Reliability Corp. (NERC) is responsible for coordinating the development of those mandatory reliability standards (written by industry experts), which become effective with approval from the Federal Energy Regulatory Commission (FERC) in the U.S. and authorization in Canada under arrangements with each province. NERC has contracted with Midwest Reliability Organization (MRO) and seven other regional entities to be responsible for compliance, monitoring, and enforcement of the reliability standards.

Development of a Risk-Based Approach

When MRO began enforcing mandatory reliability standards in 2007, every instance of noncompliance, no matter what the risk was to reliable operations of the BPS, required a formal enforcement proceeding with a filing to FERC in the U.S.…

Read More »

EnergyNorthwest.com 2025 . Powered by WordPress